VetroSGC JSC (part of the management company NovaWind JSC) received a permit for the construction of the Marchenkovskaya wind farm in the Rostov region.
The receipt of the permit was preceded by a positive conclusion of the examination of the design documentation, issued by STC “EXIR” LLC for the construction of a wind farm, consisting of 48 wind power plants with a total capacity of 120 MW, in the Zimovniki district.
Successful examination confirms that the design documentation for construction objects meets the results of engineering surveys and the requirements of all technical regulations, including environmental, sanitary and epidemiological requirements, fire safety requirements, regulatory and technical documentation and the Urban Planning Code of the Russian Federation.
“Thanks to the obtained permit, preparatory work for the construction of highways and foundations has begun at the site. The next stage will be the implementation of the entire complex of construction and installation works, the supply of equipment and components for wind turbines. At the same time, the main critical components of wind turbines are manufactured at our plant in Volgodonsk, Rostov Region, which will significantly simplify their logistics to the site," - said Alexander Korchagin, General Director of NovaWind JSC.